Tower Crane Dismantling Method Statement May 2026
The objective is to dismantle the tower crane using a mobile crane or a derrick crane, ensuring the safety of personnel, the structural integrity of the building, and the protection of the public. 2. Pre-Dismantling Requirements Before any work begins, the following must be in place:
The crane is rotated to the pre-agreed "parked" position to allow the assist crane access. tower crane dismantling method statement
If the assist crane has enough height, it simply unbolts and lifts each mast section directly from the top. The objective is to dismantle the tower crane
Any ballast weights at the base are loaded onto transport trucks. 6. Safety & Environmental Controls ensuring the safety of personnel