Menu Close

Ssis951mp4 Install Link

Once the wiring is secure, it is time to energize the system:

Use 14-18 AWG copper wire for optimal conductivity and heat management. 4. Initial Power-Up and Calibration ssis951mp4 install

If the voltage requires fine-tuning, locate the "V ADJ" potentiometer. Use a small screwdriver to turn it slowly until your desired output (e.g., 24V DC) is reached. 5. Troubleshooting Common Issues Once the wiring is secure, it is time