Saudi Aramco Schedule G =link= -

Materials provided by Aramco to the contractor at no cost, often for large-scale infrastructure like pipelines.

When Aramco provides materials, the contractor acts as a temporary custodian. Schedule G mandates strict accountability: saudi aramco schedule g

Monthly status reports are required, detailing physical locations (e.g., laydown yards or warehouses) and safety records for hazardous materials. Materials provided by Aramco to the contractor at

For items exceeding $10,000 , contractors must typically obtain at least three quotes from Saudi manufacturers and provide a cost comparison to Aramco before finalizing a purchase. For items exceeding $10,000 , contractors must typically

Schedule G serves as the primary governing document for how physical assets—ranging from massive steel pipelines to specialized construction tools—are sourced, tracked, and maintained. It distinguishes clearly between two categories of assets:

A major pillar of Schedule G is the promotion of local industry within Saudi Arabia. The document enforces specific procurement guidelines :

Schedule G does not operate in a vacuum; it is frequently cross-referenced with other critical schedules: Aramco Schedule Q: Quality Requirements | PDF - Scribd