: Two slots for expansion boards like RS485 interfaces or clock calendars.
: Single-phase generator control (L1-L2/N) with true RMS readings.
: The unit monitors the mains power and automatically starts the generator if it detects a failure or anomaly (voltage/frequency drops). lovato rgam 24 manual pdf better
: Three-phase measurement (L1-L2/N-L3) with monitoring for min-max voltage, frequency, and phase sequence.
: Allows the operator to manually start and stop the generator using front-panel keys. : Two slots for expansion boards like RS485
: Initiates a controlled generator start-up cycle to verify system readiness without necessarily switching the load. Remote Control and Supervision
: This Windows-compatible utility allows for real-time monitoring of all variables, editing setup parameters, and viewing the events log (which stores the last 255 events with timestamps). Operating Modes Explained
: Universal 12/24VDC power supply (Operating range at 24V: 13–33VDC).
: 12 digital inputs and 7 relay outputs, all with programmable properties. Operating Modes Explained