Leave at least 6 inches of clearance around the unit for future maintenance. Step 1: Prepare the Plumbing

Open the lowest faucet in the building to drain remaining water from the pipes.

Before beginning the installation, ensure you have the necessary tools and have selected an appropriate location.

Choose a dry, level surface near the main water inlet. Ensure it is protected from freezing temperatures and direct sunlight.

Connect the smaller tubing from the brine tank to the brine well on the control valve. Ensure the nut is finger-tightened, then given an extra quarter turn with a wrench. Step 4: System Startup and Programming

32 Install ((better)) - Liz Ocean Wsg

Leave at least 6 inches of clearance around the unit for future maintenance. Step 1: Prepare the Plumbing

Open the lowest faucet in the building to drain remaining water from the pipes. liz ocean wsg 32 install

Before beginning the installation, ensure you have the necessary tools and have selected an appropriate location. Leave at least 6 inches of clearance around

Choose a dry, level surface near the main water inlet. Ensure it is protected from freezing temperatures and direct sunlight. liz ocean wsg 32 install

Connect the smaller tubing from the brine tank to the brine well on the control valve. Ensure the nut is finger-tightened, then given an extra quarter turn with a wrench. Step 4: System Startup and Programming