Juq405 Install May 2026

Check the communication cables and ensure the baud rate matches the master controller.

Locate a spot on the DIN rail with at least 10-15mm of clearance on either side to allow for heat dissipation. juq405 install

Should blink or stay solid depending on the operational mode. Check the communication cables and ensure the baud