Galaxy Aqua - Premier Installation Manual

Galaxy Aqua - Premier Installation Manual

Choose a flat wall surface to avoid distorting the backplate.

The is a high-performance, instantaneous electric water heater designed for efficient unvented installation. This manual guide provides the essential steps and technical requirements to ensure a safe and professional setup. Technical Specifications Overview galaxy aqua premier installation manual

Use the backplate as a template or mark the three fixing positions. The top hole is usually a "key-hole" slot; drill this first and tighten the screw so it protrudes about 10mm. Choose a flat wall surface to avoid distorting the backplate

Before beginning, confirm your unit matches these requirements: Technical Specifications Overview Use the backplate as a

Minimum Running Pressure: 1.0 Bar (15 psi) at 8–9 litres/minute. Maximum Static Pressure: 10 Bar (150 psi).

Typically 9.5kW (also available in other variants).

Hook the unit over the top screw, align it using a spirit level, then mark and drill the remaining bottom fixing holes. 2. Plumbing Connections Galaxy Aqua Premier Water Heater 9.5Kw - 45793266